Additional Photos
Flowing Front Entrance
This springtime project brings together a few different aspects of a landscape together. Obviously the first step was our excavation as seen in the photos below. For the "Laneway Soldier Course" we excavated to a depth of 18". We followed this excavation depth for the front step system and walkway as well. The finished product is a slick interlock installation that is built to suit the lines of the residence as well as the clients taste. We installed a new light pillar that was dressed with a low profile planting bed and a natural stone. To finish the project completely we sodded the entire lawn and paved the remaining laneway area. Another satisfied customer and a project that will last!